GREEN CREST DR over DRY BRANCH

JCT SWEENY HOLLOW RD · County 073, Alabama · Built 1981 · 2 Lanes · 50 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
012520
Year Built
1981
Length
10.3 m (33.8 ft)
Max Span
3 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
50
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$226,000
Total Project Cost
$249,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.