SATURN LANE over DRY CREEK

100 FT W HWY 75 · County 073, Alabama · Built 1965 · 2 Lanes · 1,270 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
008899
Year Built
1965
Length
19.6 m (64.3 ft)
Max Span
6.8 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
1,270
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$518,000
Total Project Cost
$570,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.