CO.RD.39 over BAY MINETTE CREEK
3.3 MI. NW. OF US 31 · County 003, Alabama · Built 1996 · 2 Lanes · 730 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.776511, -87.825942
This bridge is in worse condition than 65.2% of bridges in County 003. The average bridge in Alabama is 0 years old; this one is 30 years old.
Nearby Bridges
CO.RD.39 over WHITEHOUSE CREEK
Built 1996
CO.RD.40 over WHITEHOUSE CREEK
Built 1996
ANTEBELLUM BLVD. over FOOT LOG BRANCH
Built 2007
BROMLY ROAD over BAY MINETTE CREEK
Built 2008
ANTEBELLUM BLVD. over TRIB. TO BAY MINETTE CR.
Built 2007
CO. RD. 39 over UNNAMED BRANCH
Built 2005
SR 59 over FISH RIVER
Built 1999
CO. RD. 57 over STYX RIVER
Built 1999
Jimmy Faulkner Dr. over SIBLEY CREEK
Built 2005
CO.RD. 138 over WHITEHOUSE CREEK
Built 1992
Bridge Details
- Structure #
- 016342
- Year Built
- 1996
- Length
- 41.5 m (136.2 ft)
- Max Span
- 10.4 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 730
- Material
- Concrete
- Design
- Channel Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,158,000
- Total Project Cost
- $1,274,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.