CO.RD.40 over WHITEHOUSE CREEK
0.6 MI. E. OF S.R. 225 · County 003, Alabama · Built 1996 · 2 Lanes · 772 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.776539, -87.871833
This bridge is in worse condition than 44.2% of bridges in County 003. The average bridge in Alabama is 0 years old; this one is 30 years old.
Nearby Bridges
ANTEBELLUM BLVD. over FOOT LOG BRANCH
Built 2007
ANTEBELLUM BLVD. over TRIB. TO BAY MINETTE CR.
Built 2007
BROMLY ROAD over BAY MINETTE CREEK
Built 2008
CO.RD.39 over BAY MINETTE CREEK
Built 1996
CO.RD.39 over WHITEHOUSE CREEK
Built 1996
UP SHAY BRANCH RD over SHAY BRANCH
Built 1994
SR 225 over STONEY RIDGE CREEK
Built 1951
Jimmy Faulkner Dr. over SIBLEY CREEK
Built 2005
SR 225 over BAY MINETTE CREEK
Built 1962
SR 225 over HONEYCUT CREEK
Built 1982
Bridge Details
- Structure #
- 016341
- Year Built
- 1996
- Length
- 51.8 m (169.9 ft)
- Max Span
- 10.4 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 772
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,403,000
- Total Project Cost
- $1,543,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.