CO.RD.39 over WHITEHOUSE CREEK
1.3 MI. S. OF CO. RD. 138 · County 003, Alabama · Built 1996 · 2 Lanes · 713 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.813742, -87.839025
This bridge is in worse condition than 44.2% of bridges in County 003. The average bridge in Alabama is 0 years old; this one is 30 years old.
Nearby Bridges
CO.RD.39 over BAY MINETTE CREEK
Built 1996
SR 225 over STONEY RIDGE CREEK
Built 1951
CO.RD.40 over WHITEHOUSE CREEK
Built 1996
CO.RD. 138 over WHITEHOUSE CREEK
Built 1992
SR 225 over HONEYCUT CREEK
Built 1982
DOLIVE ST. EXT. over WHITEHOUSE CREEK
Built 2003
CO. RD. 57 over STYX RIVER
Built 1999
SR 225 over RED HILL CREEK
Built 1982
PINE GROVE RD. EXT over STYX RIVER
Built 2023
ANTEBELLUM BLVD. over FOOT LOG BRANCH
Built 2007
Bridge Details
- Structure #
- 016340
- Year Built
- 1996
- Length
- 31.1 m (102 ft)
- Max Span
- 10.4 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 713
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $896,000
- Total Project Cost
- $986,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.