BROMLY ROAD over BAY MINETTE CREEK

1.6 MI. E. OF S.R. 225 · County 003, Alabama · Built 2008 · 2 Lanes · 132 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
019444
Year Built
2008
Length
51.8 m (169.9 ft)
Max Span
10.4 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
132
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,447,000
Total Project Cost
$1,592,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.