I-10 WB * EB over DUVAL STREET

1.8 MI E SR 163 · County 097, Alabama · Built 1966 · 8 Lanes · 77,672 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
014753
Year Built
1966
Reconstructed
1989
Length
77.7 m (254.9 ft)
Max Span
22.3 m
Width
45.7 m (149.9 ft)
Lanes
8
Daily Traffic
77,672
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,978,000
Total Project Cost
$9,876,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.