I-10 WB * EB over ICG RR * TENN ST

3 MI E SR 163 · County 097, Alabama · Built 1964 · 10 Lanes · 70,852 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
014743
Year Built
1964
Reconstructed
1988
Length
71 m (232.9 ft)
Max Span
17.7 m
Width
52.3 m (171.6 ft)
Lanes
10
Daily Traffic
70,852
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,536,000
Total Project Cost
$10,490,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.