I-10 WB * EB over SOUTH CAROLINA ST

3.1 MI E SR 163 · County 097, Alabama · Built 1966 · 10 Lanes · 76,852 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
014755
Year Built
1966
Reconstructed
1989
Length
48.8 m (160.1 ft)
Max Span
16.8 m
Width
53 m (173.9 ft)
Lanes
10
Daily Traffic
76,852
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,984,000
Total Project Cost
$7,682,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.