Baker St. Ext. over Southern Drain Canal

0.4M EAST I-10 · County 097, Alabama · Built 2014 · 2 Lanes · 150 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
020867
Year Built
2014
Length
24.4 m (80.1 ft)
Max Span
23.1 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
150
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$861,000
Total Project Cost
$947,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.