MICHIGAN AVE over I-10

I-10 @ MICHIGAN AVE · County 097, Alabama · Built 1966 · 4 Lanes · 7,316 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
008142
Year Built
1966
Length
120.1 m (394 ft)
Max Span
34.1 m
Width
22.2 m (72.8 ft)
Lanes
4
Daily Traffic
7,316
Material
Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,350,000
Total Project Cost
$6,985,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.