I-10 EB * WB over BAY BRANCH

5.8 MI E JCT US 90 * I-10 · County 003, Alabama · Built 1969 · 4 Lanes · 63,093 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
009856
Year Built
1969
Length
7.6 m (24.9 ft)
Max Span
2.4 m
Lanes
4
Daily Traffic
63,093
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,191,000
Total Project Cost
$5,710,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.