TURKEY BRANCH over TURKEY BRANCH DRIVE

0.5 MI. S. OF US 90 · County 003, Alabama · Built 2001 · 2 Lanes · 430 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
020549
Year Built
2001
Length
21 m (68.9 ft)
Max Span
10.4 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
430
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$611,000
Total Project Cost
$672,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.