I-10 EB * WB over STREAM

4.6 MI E JCT US 90 · County 003, Alabama · Built 1969 · 4 Lanes · 55,494 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
009855
Year Built
1969
Length
6.1 m (20 ft)
Max Span
2.4 m
Lanes
4
Daily Traffic
55,494
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,604,000
Total Project Cost
$5,064,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.