I-10 EB over FISH RIVER

7.2 MI E JCT US 90 · County 003, Alabama · Built 1970 · 2 Lanes · 27,747 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
010171
Year Built
1970
Length
134.7 m (441.9 ft)
Max Span
10.4 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
27,747
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,211,000
Total Project Cost
$4,632,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.