LRD HARDTKE DR over LITTLE MUSKEGO LAKE

0.5 MI SE JCT MARTIN DRIV · County 133, Wisconsin · Built 1960 · 2 Lanes · 530 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
P67093000000000
Year Built
1960
Reconstructed
2004
Length
8.2 m (26.9 ft)
Max Span
8.1 m
Width
6.5 m (21.3 ft)
Lanes
2
Daily Traffic
530
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$112,000
Total Project Cost
$169,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.