CTH ES (NATIONAL A over CTH Y (RACINE AVENUE)

0.8 MI W OF JCT CTH I · County 133, Wisconsin · Built 2009 · 2 Lanes · 8,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
B67030500000000
Year Built
2009
Length
70 m (229.7 ft)
Max Span
34.3 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
8,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.