CTH Y (RACINE AVE) over IH 43

0.2 MI N JCT CTH HH · County 133, Wisconsin · Built 1969 · 4 Lanes · 18,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B67011300000000
Year Built
1969
Reconstructed
2009
Length
65.2 m (213.9 ft)
Max Span
32.9 m
Width
32.5 m (106.6 ft)
Lanes
4
Daily Traffic
18,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.