LRD 35TH STREET VI over LRD W PIERCE ST
0.1M N JCT STH 59 · County 079, Wisconsin · Built 1933 · 4 Lanes · 18,735 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
43.023375, -87.95755
This bridge is in worse condition than 95.9% of bridges in County 079. The average bridge in Wisconsin is 0 years old; this one is 93 years old.
Nearby Bridges
LRD CANAL ST over CANADIAN PACIFIC RR
Built 2006
STH 59 over CNW RR
Built 1984
STH 57-27TH ST over CMSTPP RR
Built 1981
STH 57-27TH ST over LAND
Built 1981
STH 57-27TH ST over CMSTPP RR
Built 1981
STH 57-27TH ST over CMSTPP RR & CANAL ST.
Built 1981
STH 57-27TH ST over MENOMONEE RIVER
Built 1981
LRD N 35TH ST over IH 94-E-W FREEWAY
Built 1961
STH 175 over WATERWAY
Built 2006
IH RAMP STH 175 SB over CP RAILROAD
Built 1959
Bridge Details
- Structure #
- P40084700000000
- Year Built
- 1933
- Reconstructed
- 1976
- Length
- 1041.1 m (3415.7 ft)
- Max Span
- 43.4 m
- Width
- 23.2 m (76.1 ft)
- Lanes
- 4
- Daily Traffic
- 18,735
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $16,672,000
- Total Project Cost
- $25,009,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.