STH 57-27TH ST over CMSTPP RR

0.7M N JCT STH 59 · County 079, Wisconsin · Built 1981 · 4 Lanes · 26,328 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B40051300050000
Year Built
1981
Length
169 m (554.5 ft)
Max Span
57.9 m
Width
24.4 m (80.1 ft)
Lanes
4
Daily Traffic
26,328
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.