STH 57-27TH ST over IH 94-E-W FREEWAY
0.8M N JCT USH 41 · County 079, Wisconsin · Built 1960 · 4 Lanes · 15,900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
43.034086, -87.947764
This bridge is in worse condition than 68.5% of bridges in County 079. The average bridge in Wisconsin is 0 years old; this one is 66 years old.
Nearby Bridges
LRD W ST PAUL AVE- over IH 94-E-W FREEWAY
Built 1960
LRD N 25TH STREET over LRD GREVES STREET
Built 1979
LRD N 25TH ST over IH 94-E-W FREEWAY
Built 1957
LRD N 25TH STREET over MENOMONEE RIVER
Built 1980
LRD CANAL ST over MENOMONEE RIVER
Built 2006
IH 94-E-W FREEWAY over LRD N 32ND ST
Built 1956
STH 57-27TH ST over MENOMONEE RIVER
Built 1981
STH 57-27TH ST over CMSTPP RR
Built 1981
STH 57-27TH ST over CMSTPP RR & CANAL ST.
Built 1981
STH 57-27TH ST over CMSTPP RR
Built 1981
Bridge Details
- Structure #
- B40004300000000
- Year Built
- 1960
- Reconstructed
- 1981
- Length
- 47.1 m (154.5 ft)
- Max Span
- 25.5 m
- Width
- 24.4 m (80.1 ft)
- Lanes
- 4
- Daily Traffic
- 15,900
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $824,000
- Total Project Cost
- $1,236,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.