STH 59 over CNW RR
0.1M E JCT STH 341 TO N · County 079, Wisconsin · Built 1984 · 4 Lanes · 14,200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
43.020992, -87.966981
This bridge is in worse condition than 40.6% of bridges in County 079. The average bridge in Wisconsin is 0 years old; this one is 42 years old.
Nearby Bridges
STH 175 over WATERWAY
Built 2006
IH RAMP STH 175 SB over CP RAILROAD
Built 1959
LRD FREDERICK MILL over STH 175
Built 1998
LRD 35TH STREET VI over LRD W PIERCE ST
Built 1933
STH 175 NB over LRD SELIG DR/PEDESTRIAN
Built 1998
IH RAMP IH 94 WB - over LAND
Built 1959
STH 175 SB over LAND
Built 1959
STH 175 SB over LRD SELIG DR/PEDESTRIAN
Built 1998
LRD CANAL ST over CANADIAN PACIFIC RR
Built 2006
IH 94 EB-STADIUM I over CMSTPP RR
Built 1959
Bridge Details
- Structure #
- B40053400000000
- Year Built
- 1984
- Length
- 12.7 m (41.7 ft)
- Max Span
- 11.6 m
- Width
- 19.8 m (65 ft)
- Lanes
- 4
- Daily Traffic
- 14,200
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $275,000
- Total Project Cost
- $413,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.