STH 175 NB over LRD SELIG DR/PEDESTRIAN

0.6 M N JCT STH 59 · County 079, Wisconsin · Built 1998 · 4 Lanes · 24,650 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B40065300000000
Year Built
1998
Length
59.1 m (193.9 ft)
Max Span
21.3 m
Width
20.6 m (67.6 ft)
Lanes
4
Daily Traffic
24,650
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.