IH 94 WB-E-W FREEW over LRD 44TH ST/ CP RAILWAY

2.4M W JCT IH 43 TO N · County 079, Wisconsin · Built 1959 · 5 Lanes · 81,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B40005000000000
Year Built
1959
Reconstructed
1997
Length
154.8 m (507.9 ft)
Max Span
31.5 m
Width
19 m (62.3 ft)
Lanes
5
Daily Traffic
81,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,976,000
Total Project Cost
$2,965,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.