STH 175 SB over IH RAMP STH 175 NB - IH

0.2M S JCT IH 94 TO W · County 079, Wisconsin · Built 1959 · 3 Lanes · 24,650 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B40004000010000
Year Built
1959
Reconstructed
1998
Length
49.1 m (161.1 ft)
Max Span
27.2 m
Width
14.8 m (48.6 ft)
Lanes
3
Daily Traffic
24,650
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$665,000
Total Project Cost
$997,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.