LRD STAMPER RD over EVERGREEN CREEK
2.6M S JCT STH 64 · County 067, Wisconsin · Built 1930 · 2 Lanes · 222 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
45.157889, -88.801444
This bridge is in worse condition than 62.8% of bridges in County 067. The average bridge in Wisconsin is 0 years old; this one is 96 years old.
Nearby Bridges
LRD OLD 64 (DEAD E over EVERGREEN CREEK
Built 1916
STH 64 over WOLF RIVER
Built 1948
STH 64 over ELTON CREEK
Built 2022
IRR BIA RTE 116 over EATON CREEK
Built 2008
UPPER BASS LAKE RD over SQUAW CREEK
Built 2007
STH 55 over NINE MILE CREEK
Built 2024
LRD VAN ALSTINE RD over S BR OCONTO RIVER
Built 1921
STH 64 over S BR OCONTO RIVER
Built 1997
CTH M over WOLF RIVER
Built 1985
IRR BIA RTE 1011 over EVERGREEN CREEK
Built 1985
Bridge Details
- Structure #
- P34092100000000
- Year Built
- 1930
- Length
- 7.3 m (24 ft)
- Max Span
- 6.9 m
- Width
- 6.4 m (21 ft)
- Lanes
- 2
- Daily Traffic
- 222
- Material
- Concrete
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $91,000
- Total Project Cost
- $136,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.