STH 64 over WOLF RIVER

2.4M E JCT CTH M · County 067, Wisconsin · Built 1948 · 2 Lanes · 1,600 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B34083800000000
Year Built
1948
Reconstructed
1980
Length
43 m (141.1 ft)
Max Span
20.8 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
1,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$589,000
Total Project Cost
$884,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.