LRD VAN ALSTINE RD over S BR OCONTO RIVER
1.9M E JCT STH 55 · County 067, Wisconsin · Built 1921 · 2 Lanes · 17 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
45.178361, -88.680639
This bridge is in worse condition than 84.6% of bridges in County 067. The average bridge in Wisconsin is 0 years old; this one is 105 years old.
Nearby Bridges
STH 64 over S BR OCONTO RIVER
Built 1997
STH 64 over WOLF RIVER
Built 1948
CTH T over S BR OCONTO RIVER
Built 1993
STH 64 over HILLS POND CREEK
Built 2002
CTH M over WOLF RIVER
Built 1985
CTH W over S BR OCONTO RIVER
Built 2000
LRD STAMPER RD over EVERGREEN CREEK
Built 1930
LRD OLD 64 (DEAD E over EVERGREEN CREEK
Built 1916
STH 64 over SECOND S BR OCONTO RIVER
Built 2002
IRR BIA RTE 3 over WOLF RIVER
Built 2005
Bridge Details
- Structure #
- P34006800000000
- Year Built
- 1921
- Length
- 8.4 m (27.6 ft)
- Max Span
- 7.9 m
- Width
- 6.6 m (21.7 ft)
- Lanes
- 2
- Daily Traffic
- 17
- Material
- Concrete
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $99,000
- Total Project Cost
- $149,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.