LRD CARDINAL RD over N BR PESHTIGO RIVER
2.5M N JCT CTH G · County 041, Wisconsin · Built 1921 · 2 Lanes · 34 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
45.683361, -88.815889
This bridge is in worse condition than 88.7% of bridges in County 041. The average bridge in Wisconsin is 0 years old; this one is 105 years old.
Nearby Bridges
LRD CARDINAL RD over N BR PESHTIGO RIVER
Built 1924
LRD DICK SAMZ RD over N BR PESHTIGO RIVER
Built 1982
CTH G over S BRANCH PESHTIGO RIVER
Built 2019
LRD WAGGONER RD over W BR PESHTIGO RIVER
Built 1989
STH 55 over N BR PESHTIGO RIVER
Built 1962
LRD PESHTIGO RIVER over W BR PESHTIGO RIVER
Built 1998
STH 32 over MID BR PESHTIGO R
Built 2022
CTH G over OTTER CREEK
Built 1969
CTH O over PESHTIGO RIVER
Built 1976
STH 55 over POPPLE RIVER
Built 2001
Bridge Details
- Structure #
- P21003400000000
- Year Built
- 1921
- Length
- 10.3 m (33.8 ft)
- Max Span
- 9.8 m
- Width
- 6.8 m (22.3 ft)
- Lanes
- 2
- Daily Traffic
- 34
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $114,000
- Total Project Cost
- $171,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.