LRD WAGGONER RD over W BR PESHTIGO RIVER
0.6M S JCT CTH G · County 041, Wisconsin · Built 1989 · 2 Lanes · 93 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
45.650278, -88.8205
This bridge is in worse condition than 50.9% of bridges in County 041. The average bridge in Wisconsin is 0 years old; this one is 37 years old.
Nearby Bridges
CTH G over S BRANCH PESHTIGO RIVER
Built 2019
LRD DICK SAMZ RD over N BR PESHTIGO RIVER
Built 1982
LRD PESHTIGO RIVER over W BR PESHTIGO RIVER
Built 1998
LRD CARDINAL RD over N BR PESHTIGO RIVER
Built 1921
LRD CARDINAL RD over N BR PESHTIGO RIVER
Built 1924
STH 32 over MID BR PESHTIGO R
Built 2022
STH 55 over N BR PESHTIGO RIVER
Built 1962
CTH G over OTTER CREEK
Built 1969
CTH O over PESHTIGO RIVER
Built 1976
STH 32-STH 55-LAKE over WISCONSIN CENTRAL RR
Built 1992
Bridge Details
- Structure #
- B21001300000000
- Year Built
- 1989
- Length
- 11.8 m (38.7 ft)
- Max Span
- 11.8 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 93
- Material
- Concrete
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.