CTH G over S BRANCH PESHTIGO RIVER

3.6M E JCT STH 32 · County 041, Wisconsin · Built 2019 · 2 Lanes · 770 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
B21003000000000
Year Built
2019
Length
13 m (42.7 ft)
Max Span
12.2 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
770
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.