LRD W MAIL RD over ST CROIX RIVER 13
2.9M S JCT CTH M · County 031, Wisconsin · Built 1963 · 2 Lanes · 107 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
46.254861, -91.963611
This bridge is in worse condition than 86.8% of bridges in County 031. The average bridge in Wisconsin is 0 years old; this one is 63 years old.
Nearby Bridges
LRD W MAIL RD over MOOSE RIVER
Built 2011
LRD CROTTE BROOK T over SHEOSH CREEK
Built 1999
CTH M over MOOSE RIVER
Built 1934
CTH T over MINONG FLOWAGE
Built 2005
CTH T over ST CROIX RIVER 12
Built 1976
CTH SMITH BRIDGE R over MINONG FLOWAGE
Built 2015
CTH A over MOOSE RIVER
Built 2003
USH 53 NB over ST CROIX RIVER 14
Built 1996
USH 53 SB over ST CROIX RIVER 14
Built 1997
LRD OLD HWY 53 over ST CROIX RIVER 15
Built 1928
Bridge Details
- Structure #
- P16011900000000
- Year Built
- 1963
- Length
- 18.5 m (60.7 ft)
- Max Span
- 17.8 m
- Width
- 6.7 m (22 ft)
- Lanes
- 2
- Daily Traffic
- 107
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $177,000
- Total Project Cost
- $266,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.