CTH T over ST CROIX RIVER 12

5.5M E JCT STH 35 · County 031, Wisconsin · Built 1976 · 2 Lanes · 483 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B16004000000000
Year Built
1976
Length
62.7 m (205.7 ft)
Max Span
30.8 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
483
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.