CTH M over MOOSE RIVER

6.9M W JCT USH 53 · County 031, Wisconsin · Built 1934 · 2 Lanes · 325 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
P16005900000000
Year Built
1934
Reconstructed
2012
Length
23.5 m (77.1 ft)
Max Span
11.4 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
325
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$264,000
Total Project Cost
$397,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.