LRD FAIRGROUND AVE over WISC CENTRAL LTD
0.4M N JCT CTH X · County 019, Wisconsin · Built 1946 · 1 Lanes · 58 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
44.955028, -90.577347
This bridge is in worse condition than 75.2% of bridges in County 019. The average bridge in Wisconsin is 0 years old; this one is 80 years old.
Nearby Bridges
LRD WILLOW RD over BRICK CREEK
Built 2015
CTH X 3RD ST over POPPLE RIVER
Built 1925
STH 29 WB over POPPLE RIVER
Built 1997
STH 29 E over POPPLE RIVER
Built 1961
STH 29 over POPPLE RIVER
Built 1996
STH 29 E over CTH D
Built 1962
STH 29 WB over CTH D
Built 1997
STH 29 E over WISCONSIN CENTRAL RR
Built 1962
STH 29 W over WISC CENTRAL LTD RR
Built 1997
STH 73 SB over STH 29
Built 1994
Bridge Details
- Structure #
- P10008000000000
- Year Built
- 1946
- Length
- 41.5 m (136.2 ft)
- Max Span
- 7.1 m
- Width
- 5.5 m (18 ft)
- Lanes
- 1
- Daily Traffic
- 58
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $353,000
- Total Project Cost
- $530,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.