STH 29 E over CTH D

1.0M E JCT CTH DD · County 019, Wisconsin · Built 1962 · 2 Lanes · 5,950 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B10002200000000
Year Built
1962
Reconstructed
1998
Length
44.5 m (146 ft)
Max Span
15.2 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
5,950
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.