STH 73 SB over STH 29

1.7M N JCT CTH N TO W · County 019, Wisconsin · Built 1994 · 2 Lanes · 2,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B10017700000000
Year Built
1994
Length
62 m (203.4 ft)
Max Span
21.3 m
Width
20.4 m (66.9 ft)
Lanes
2
Daily Traffic
2,800
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.