CTH W over SEELEY CREEK

1.7M E JCT CTH D · County 111, Wisconsin · Built 1992 · 2 Lanes · 293 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
B56011300000000
Year Built
1992
Length
13.4 m (44 ft)
Max Span
6.7 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
293
Material
Wood or Timber
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.