CTH W over SEELEY CREEK

2.0M E JCT CTH D · County 111, Wisconsin · Built 1992 · 2 Lanes · 293 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B56011200000000
Year Built
1992
Length
11.9 m (39 ft)
Max Span
6 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
293
Material
Wood or Timber
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.