CTH PF over SEELEY CREEK

0.5M S JCT CTH W · County 111, Wisconsin · Built 2009 · 2 Lanes · 540 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
B56020300000000
Year Built
2009
Length
31.2 m (102.4 ft)
Max Span
15.2 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
540
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.