IH 39 NB / IH 90 W over SPRING BROOK / SPRING BR

PLEASE UPDATE LOCATION · County 105, Wisconsin · Built 2018 · 2 Lanes · 38,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
B53033300000000
Year Built
2018
Length
34.9 m (114.5 ft)
Max Span
33.5 m
Width
22.8 m (74.8 ft)
Lanes
2
Daily Traffic
38,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.