IH 39 NB / IH 90 W over LRD PALMER DR

0.6M W JCT STH 11 TO E · County 105, Wisconsin · Built 2018 · 4 Lanes · 29,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
B53033100000000
Year Built
2018
Length
22.1 m (72.5 ft)
Max Span
20.7 m
Width
25.8 m (84.6 ft)
Lanes
4
Daily Traffic
29,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.