IH 39 SB / IH 90 E over LRD PALMER DRIVE

2.7M E JCT USH 14 TO E · County 105, Wisconsin · Built 2019 · 5 Lanes · 29,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B53033000000000
Year Built
2019
Length
22.1 m (72.5 ft)
Max Span
20.7 m
Width
25.8 m (84.6 ft)
Lanes
5
Daily Traffic
29,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.