CTH C over LANE CREEK

0.1M E JCT USH 18 · County 043, Wisconsin · Built 1961 · 2 Lanes · 1,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B22004900000000
Year Built
1961
Length
7.7 m (25.3 ft)
Max Span
6.9 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
1,200
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.