STH 60 over WISCONSIN RIVER TRIB

0.6M E JCT USH 18 TO E · County 023, Wisconsin · Built 1967 · 2 Lanes · 2,000 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
B12002600000000
Year Built
1967
Length
15 m (49.2 ft)
Max Span
3 m
Lanes
2
Daily Traffic
2,000
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.