STH 60 over TUCKER HOLLOW RUN

1.9M E JCT USH 18 TO E · County 023, Wisconsin · Built 1988 · 2 Lanes · 2,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
B12005400000000
Year Built
1988
Length
10.1 m (33.1 ft)
Max Span
3 m
Lanes
2
Daily Traffic
2,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.