CTH A over SUGAR RIVER

0.6M W JCT STH 69 · County 025, Wisconsin · Built 2017 · 2 Lanes · 530 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
B13068500000000
Year Built
2017
Length
47.9 m (157.2 ft)
Max Span
23.3 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
530
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.