CTH PB over TRIB SUGAR RIVER

0.5M N JCT STH 69 · County 025, Wisconsin · Built 1954 · 2 Lanes · 4,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
P13094100000000
Year Built
1954
Reconstructed
1984
Length
7 m (23 ft)
Max Span
6.4 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
4,700
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.