LRD SUN VALLEY PAR over WISC-CALUMET RR
0.9M E JCT CTH PB · County 025, Wisconsin · Built 1937 · 2 Lanes · 168 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.928639, -89.505444
This bridge is in worse condition than 82.5% of bridges in County 025. The average bridge in Wisconsin is 0 years old; this one is 89 years old.
Nearby Bridges
CTH PB over SUGAR RIVER
Built 2018
STH 69 over SUGAR RIVER
Built 1998
LRD RANGE TRAIL RO over SUGAR RIVER
Built 1989
CTH PB over BRANCH OF SUGAR RIVER
Built 2014
CTH A over SUGAR RIVER
Built 2017
STH 69 over SUGAR RIVER
Built 1998
CTH A over STORY CREEK
Built 2016
CTH PB over BR SUGAR RIVER
Built 1984
LRD FRENCHTOWN ROA over SUGAR RIVER
Built 1989
LRD FRENCH TOWN RD over BR SUGAR RIVER
Built 1993
Bridge Details
- Structure #
- B13012700000000
- Year Built
- 1937
- Length
- 35.7 m (117.1 ft)
- Max Span
- 11.1 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 168
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.