CTH PB over BRANCH OF SUGAR RIVER

AT SUGAR RIVER BRANCH · County 025, Wisconsin · Built 2014 · 2 Lanes · 8,400 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
B13067800000000
Year Built
2014
Length
17 m (55.8 ft)
Max Span
6.5 m
Lanes
2
Daily Traffic
8,400
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.